Fort Myers, FL
Custom luxury on 2.2 acres
Step inside Brynwood Estate and explore every detail of this custom build.
2.2 acres
Lot Size
4,371 SF
Living Space
Under air
3 + Den
Bedrooms
3 Full
Bathrooms
A ground-up custom estate designed for Florida living. Over 7,100 square feet of thoughtfully designed space, including a 700 SF cabana with summer kitchen and expansive covered lanai. Every detail engineered for performance, every finish selected for timeless appeal.

The Neighborhood
Brynwood is a gated community centrally located in the Daniels Corridor, just a block from the Shops at Bell Tower. This quiet neighborhood of 47 single-family homes offers a rare combination of privacy, convenience, and acreage not commonly found in Southwest Florida. Oversized one to three acre lots with mature vegetation create a serene, private setting for low-key, luxurious living.
Gated Community
24/7 controlled access for privacy and security
Mature Landscaping
Established vegetation throughout the neighborhood
47 Homes
An intimate, exclusive community
Prime Location
Steps from Bell Tower Shops and Daniels Corridor
Fort Myers, FL
Brynwood

Custom Design
This wasn't a spec home with pre-selected finishes. Every element was custom designed in collaboration with the homeowner—from the floor plan layout to the cabinet hardware. The result is a home that reflects exactly how they wanted to live, with no compromises.
Floor Plan
Thoughtfully designed for Florida living
Living Area
10'–16' ceiling
4,371 SF
Cabana / Summer Kitchen
11' tray ceiling
698 SF
Covered Lanai
11' tray ceiling
638 SF
3-Car Garage
10' ceiling
1,351 SF
Entry
16' ceiling
99 SF

Click to enlarge
From first meeting to move-in day — 14 months
3 months
Custom architectural plans developed with the homeowner. Site engineering, energy calculations, and permit submissions with Lee County.
6 weeks
Land clearing, fill placement, and stem wall foundation. Underground utilities and pool excavation completed.
3 months
CBS block walls, roof trusses, and standing seam metal roofing. Impact windows and doors installed for dry-in.
6 weeks
Electrical, plumbing, and HVAC rough installation. Low-voltage wiring for smart home and audio systems.
3 months
Interior finishes including flooring, cabinetry, countertops, and paint. Custom millwork and lighting installation.
6 weeks
Pool and spa construction, paver installation, and professional landscaping. Cabana and summer kitchen completed.
How We Work
Complete transparency from first meeting to final walkthrough
Daily photo updates and progress reports. The owners always knew exactly what was happening on their job site, even from out of state.
We walked through every single selection together—tile, fixtures, paint colors, hardware. Nothing was chosen without owner approval.
Full visibility into costs at every stage. No surprise change orders. Regular budget check-ins to track spending against plan.
The owners had Steve's cell phone. Questions answered same-day. No layers between the homeowner and the person building their home.
Every invoice, every line item available for review. The owners knew exactly what they were paying for and why.
Scheduled walkthroughs at each phase milestone. In-person review of work quality and upcoming decisions.
Explore every detail of this custom estate
2.2 acres of carefully planned Florida living
Engineering and construction details
Quality construction with premium materials throughout
Working with Noam and Steve felt like working with family. Steve was on site every day making sure every detail was right, and Noam kept us informed throughout the entire process. As a father-son team, you can tell they take personal pride in their work. Our home turned out better than we imagined.Brynwood Homeowner